{
  "story": {
    "slug": "anchorage-wants-to-burn-your-trash",
    "headline": "anchorage wants to burn your trash",
    "deck": "Anchorage officials are planning a waste-to-energy plant at the Eagle River landfill that could power about 20,000 homes.",
    "url": "https://thedailyalaska.com/story/anchorage-wants-to-burn-your-trash",
    "section": "Energy",
    "area": "Anchorage",
    "published_at": "2026-08-11T20:00:00+00:00",
    "updated_at": "2026-10-01T05:30:06.668821+00:00",
    "body_md": "The Municipality of Anchorage is drawing up plans for a waste-to-energy plant that would be built inside the existing footprint of the Anchorage Regional Landfill near Eagle River. Solid Waste Services director Kelli Toth says the project could fundamentally transform how the city manages its utilities.\n\nThe facility would burn household trash to drive steam turbines, generating 20 to 30 megawatts of electricity, enough to power the equivalent of about 20,000 homes. The idea gains urgency as Southcentral Alaska faces uncertainty over its natural gas supply.\n\nBurning the waste would also shrink landfill volume by roughly 90 percent, stretching the landfill's usable life by decades. The city says it could avoid replacing an aging sewage incinerator, an upgrade estimated to cost $75 million, and the process would eliminate methane emissions from buried waste. Metals left in the ash would be recovered for recycling.\n\nNo funding has been approved. A financial plan for the project is expected to go before the Anchorage Assembly in May 2027. If it moves forward, construction could begin in 2030, with the plant operational by 2032.",
    "sources": [
      {
        "url": "https://www.adn.com/alaska-news/anchorage/2026/07/26/anchorage-eyes-waste-incinerator-system-that-could-fundamentally-transform-local-utilities/",
        "label": "adn.com"
      }
    ]
  },
  "envelope": {
    "story_id": "69291dfa-bc22-4517-a87d-2078eb454f39",
    "slug": "anchorage-wants-to-burn-your-trash",
    "summary": "The Municipality of Anchorage is planning a waste-to-energy plant at the Anchorage Regional Landfill near Eagle River, generating 20 to 30 megawatts (about 20,000 homes). A financial plan goes to the Anchorage Assembly in May 2027; construction could start in 2030, operation by 2032.",
    "key_facts": [
      "The plant would generate 20 to 30 megawatts, enough for about 20,000 homes",
      "It would be sited inside the existing Anchorage Regional Landfill footprint near Eagle River",
      "Burning trash would cut landfill volume by roughly 90 percent, extending its life by decades",
      "The city could avoid replacing an aging sewage incinerator, saving an estimated $75 million",
      "A financial plan is expected before the Anchorage Assembly in May 2027",
      "Construction could start in 2030 with operation beginning in 2032"
    ],
    "faq": [],
    "claims": [
      {
        "claim": "The waste-to-energy plant would generate 20 to 30 megawatts of electricity, enough to power about 20,000 homes.",
        "confidence": "sourced",
        "source_url": "https://www.adn.com/alaska-news/anchorage/2026/07/26/anchorage-eyes-waste-incinerator-system-that-could-fundamentally-transform-local-utilities/",
        "source_label": "adn.com"
      },
      {
        "claim": "Burning the trash would reduce landfill volume by about 90 percent, extending the landfill's life by decades.",
        "confidence": "sourced",
        "source_url": "https://www.adn.com/alaska-news/anchorage/2026/07/26/anchorage-eyes-waste-incinerator-system-that-could-fundamentally-transform-local-utilities/",
        "source_label": "adn.com"
      },
      {
        "claim": "The city could avoid replacing an aging sewage incinerator, saving an estimated $75 million.",
        "confidence": "sourced",
        "source_url": "https://www.adn.com/alaska-news/anchorage/2026/07/26/anchorage-eyes-waste-incinerator-system-that-could-fundamentally-transform-local-utilities/",
        "source_label": "adn.com"
      },
      {
        "claim": "A financial plan for the project is expected before the Anchorage Assembly in May 2027.",
        "confidence": "sourced",
        "source_url": "https://www.adn.com/alaska-news/anchorage/2026/07/26/anchorage-eyes-waste-incinerator-system-that-could-fundamentally-transform-local-utilities/",
        "source_label": "adn.com"
      }
    ],
    "locations": [
      {
        "area": "Anchorage",
        "kind": "facility",
        "name": "Anchorage Regional Landfill"
      },
      {
        "area": "Anchorage",
        "kind": "neighborhood",
        "name": "Eagle River"
      },
      {
        "area": "Anchorage",
        "kind": "city",
        "name": "Anchorage"
      }
    ],
    "people": [
      {
        "org": "Municipality of Anchorage",
        "name": "Kelli Toth",
        "title": "Solid Waste Services director"
      }
    ],
    "organizations": [
      {
        "kind": "government",
        "name": "Municipality of Anchorage"
      },
      {
        "kind": "legislature",
        "name": "Anchorage Assembly"
      },
      {
        "kind": "agency",
        "name": "Solid Waste Services"
      }
    ],
    "event_dates": [
      {
        "date": "2027-05",
        "label": "Financial plan expected before the Anchorage Assembly"
      },
      {
        "date": "2030",
        "label": "Construction could start"
      },
      {
        "date": "2032",
        "label": "Plant could become operational"
      }
    ],
    "story_status": "scheduled",
    "what_changed": null,
    "keywords": [
      "anchorage waste to energy plant",
      "anchorage regional landfill",
      "eagle river incinerator",
      "kelli toth solid waste services",
      "anchorage assembly may 2027",
      "southcentral alaska natural gas supply"
    ],
    "disclosure": "Produced with AI assistance, narrated with Slav Lund's voice clone with his consent, and reviewed by a person before publishing.",
    "generated_at": "2026-10-01T05:30:06.624+00:00",
    "reviewed_at": null,
    "updated_at": "2026-10-01T05:30:06.668821+00:00"
  },
  "entities": [
    {
      "slug": "anchorage-regional-landfill",
      "name": "Anchorage Regional Landfill",
      "kind": "place",
      "role": "subject",
      "url": "https://thedailyalaska.com/codex/anchorage-regional-landfill"
    },
    {
      "slug": "solid-waste-services-anchorage",
      "name": "Solid Waste Services",
      "kind": "organization",
      "role": "source",
      "url": "https://thedailyalaska.com/codex/solid-waste-services-anchorage"
    },
    {
      "slug": "anchorage-assembly",
      "name": "Anchorage Assembly",
      "kind": "organization",
      "role": "mentioned",
      "url": "https://thedailyalaska.com/codex/anchorage-assembly"
    },
    {
      "slug": "eagle-river",
      "name": "Eagle River",
      "kind": "place",
      "role": "location",
      "url": "https://thedailyalaska.com/codex/eagle-river"
    }
  ],
  "corrections": [],
  "underwriting": null,
  "jsonld": {
    "@context": "https://schema.org",
    "@type": "NewsArticle",
    "headline": "anchorage wants to burn your trash",
    "description": "The Municipality of Anchorage is planning a waste-to-energy plant at the Anchorage Regional Landfill near Eagle River, generating 20 to 30 megawatts (about 20,000 homes). A financial plan goes to the Anchorage Assembly in May 2027; construction could start in 2030, operation by 2032.",
    "abstract": "The Municipality of Anchorage is planning a waste-to-energy plant at the Anchorage Regional Landfill near Eagle River, generating 20 to 30 megawatts (about 20,000 homes). A financial plan goes to the Anchorage Assembly in May 2027; construction could start in 2030, operation by 2032.",
    "datePublished": "2026-08-11T20:00:00+00:00",
    "dateModified": "2026-10-01T05:30:06.668821+00:00",
    "mainEntityOfPage": "https://thedailyalaska.com/story/anchorage-wants-to-burn-your-trash",
    "url": "https://thedailyalaska.com/story/anchorage-wants-to-burn-your-trash",
    "author": {
      "@type": "Person",
      "name": "Slav Lund",
      "url": "https://thedailyalaska.com/codex/slav-lund"
    },
    "publisher": {
      "@type": "NewsMediaOrganization",
      "@id": "https://thedailyalaska.com/#organization",
      "name": "The Daily Alaska",
      "url": "https://thedailyalaska.com",
      "logo": {
        "@type": "ImageObject",
        "url": "https://thedailyalaska.com/__l5e/assets-v1/905bb2e5-b597-453b-a39d-7741edb068dc/the-daily-alaska-logo.png"
      }
    },
    "isAccessibleForFree": true,
    "inLanguage": "en-US",
    "articleSection": "Energy",
    "keywords": "anchorage waste to energy plant, anchorage regional landfill, eagle river incinerator, kelli toth solid waste services, anchorage assembly may 2027, southcentral alaska natural gas supply",
    "about": [
      {
        "@type": "Thing",
        "name": "Anchorage Regional Landfill",
        "url": "https://thedailyalaska.com/codex/anchorage-regional-landfill"
      }
    ],
    "mentions": [
      {
        "@type": "Thing",
        "name": "Solid Waste Services",
        "url": "https://thedailyalaska.com/codex/solid-waste-services-anchorage"
      },
      {
        "@type": "Thing",
        "name": "Anchorage Assembly",
        "url": "https://thedailyalaska.com/codex/anchorage-assembly"
      },
      {
        "@type": "Thing",
        "name": "Eagle River",
        "url": "https://thedailyalaska.com/codex/eagle-river"
      }
    ],
    "citation": [
      {
        "@type": "CreativeWork",
        "name": "adn.com",
        "url": "https://www.adn.com/alaska-news/anchorage/2026/07/26/anchorage-eyes-waste-incinerator-system-that-could-fundamentally-transform-local-utilities/"
      }
    ],
    "contentLocation": [
      {
        "@type": "Place",
        "name": "Anchorage Regional Landfill"
      },
      {
        "@type": "Place",
        "name": "Eagle River"
      },
      {
        "@type": "Place",
        "name": "Anchorage"
      }
    ]
  }
}